A second warehouse is one of the largest commitments a distributor makes. Done well, it puts stock closer to customers you already serve and opens a region you cannot reach today. Done poorly, it doubles your overhead without adding enough sales to pay for it. This article covers the signals to watch, how to build the business case from your own numbers, the two common ways to run two sites, and the mistakes to avoid.
Signals worth investigating
None of these on its own means you need a second building. Several together mean it is time to run the numbers.
- Routes are running out of hours. Break each route's day into drive time out to the first stop, time between stops, and the drive back. If a growing share of the day goes to driving out and back rather than delivering, distance is the constraint, not the number of trucks.
- Customers are clustering far from your dock. Map your customers by gross margin. If new business keeps landing in a region a long drive away, a closer site may serve it more cheaply.
- You are losing business on timing. If prospects in a region choose competitors because they can order later (a later cut-off time) or get an earlier delivery window, write down each case. A pattern of lost deals is evidence; one story is not.
- The current building is full. If you are out of cold storage, dock doors or staging space, you face a facility decision anyway. Compare one larger site with two smaller ones.
- You have the cash and the management time. A second site needs a manager you trust, inventory to fill it, and months of leadership attention. If those are already stretched, the right answer may be to wait.
Build the business case
The decision comes down to one question: will the extra gross profit and the cost savings the site produces cover what it adds in cost, with room to spare? Gather these numbers first:
- Yearly fixed costs of the new site: rent or mortgage, utilities (refrigeration is a large part), insurance, equipment leases, a site manager and baseline staff, and systems.
- One-time costs: racking, refrigeration work, fit-out, moving, hiring and training.
- Extra inventory: the stock needed to fill the new site. It is cash tied up from the first day, plus spoilage risk on perishable lines. It does not show on the income statement, so it is easy to forget.
- Route savings: fewer miles and hours to serve customers already in the region. Estimate these from your current route data.
- New sales: realistic extra sales in the region, built from named prospects and current regional growth, not from a market-size guess.
- Your gross margin percentage on the business the site will serve.
Then do the arithmetic. Here is a hypothetical example with round numbers. It is an illustration, not a benchmark:
Suppose the second site adds $400,000 a year in fixed costs, and serving existing regional customers from it saves $100,000 a year in route costs. The site then needs to produce $300,000 a year in new gross profit to break even. At a 20 percent gross margin, that is $1,500,000 a year in sales you would not otherwise have. If your named prospects and current regional growth support well above that, the case is worth pursuing. If they support half of it, the answer is not yet.
Run the same calculation again with a pessimistic sales figure and a slower ramp. If the site only works when everything goes right, treat that as a no. The route cost calculator can help you estimate what each route costs today, which is the starting point for the savings line.
Two ways to run two sites
- Full catalog at both. Each warehouse stocks most items and runs on its own, with transfers when one runs short. Service is simpler to promise, but you carry more inventory, including slow movers, in two places.
- Hub and spoke. The main site keeps the full catalog. The second site stocks the faster-moving items for its region and receives regular transfers from the hub for the rest. This ties up less inventory but depends on a reliable transfer schedule, and some customer orders wait on that transfer truck.
Use your velocity reports, split by region, to decide which items belong at the spoke. Items that sell steadily in the region are good candidates. Slow, perishable items are usually better kept in one place, where all of their demand is pooled.
Common mistakes
- Choosing the building before the location. A good lease in the wrong place is a bad deal. Start from where your customers are, and where they are heading, then look for space.
- Optimistic sales plans. Base the plan on named accounts and a slow ramp. Treat anything above that as upside.
- Underfunding inventory. The stock to fill a new site is paid for before it earns anything. Plan the cash, including the supplier terms you will get on the first orders.
- Two sites, two ways of working. If receiving, picking, counting and pricing are done differently at each site, the reports stop being comparable and problems hide. Write down one set of processes and train both teams on it.
- Split attention. Owners often spend months at the new site. Make sure someone is clearly in charge of the original one while that happens.
Systems to have ready before opening day
Before the second site opens, check that your systems can:
- Track stock, lots and expiry separately by warehouse.
- Build routes from each site.
- Report sales, margin and inventory by warehouse as well as combined.
- Limit what each person sees and does to the sites they work at.
- Forecast demand by warehouse, so each site orders for its own customers.
Setting this up before you open is far easier than adding it once two buildings are already running on workarounds.
How APFoodz handles it
APFoodz produces demand forecasts for each warehouse and builds routes around truck capacity and delivery windows, so each site's demand and delivery load can be planned on its own.